Quantum South Tower Condos


•  Corridor 36 + g , 334 suites + 2 guest;
•  Start June 29, 2015 - completed Nov 2015.

Quantum Tower South was built in 2007 by Minto. It is located in the coveted area of Yonge and has 36 stories and 334 suites. Although reasonably new, many of the finishes looked tired and dull and needed a lift.

The board undertook a refurbishment of their corridors, in part to uplift the look of the corridors and keep up with the competing condominiums in the neighbourhood. JCO was awarded the refurbishment project and commenced the construction in June 2015. It was completed in November 2015.

What needed to be replaced most was the carpet, wall covering and paint. The other finishes such as the lighting, the suite doors and hardware still looked good. In addition, the board decided to add tile to the elevator lobbies which had the biggest impact on the look of quality in the building.

This refurbishment had just the impact it needed to make a significant difference to the overall look of this relatively new building.